3. Basic and administrative project of the Terminal
Product: Basic project.
Collaboration: ProportBCN and if it is necessary with engineering specialist.
Development of the selected alternative, together with advancements in the aspects of engineering and architecture come together in the operation of the facility.
The project is carried out in such a way that optimally meets the various clauses of the specification of the port authority.
Here is a cost estimate on the basis of drawings and specifications of the project and the premeasurement of facilities and equipment.
We use the value engineering methodology, Value Engineering, which is based on the definition of the starting hypothesis of the project through the project assumptions, carried out from the functional point of view, with precise technical definitions (when required) so that the consulting engineering, together with the client, the construction company and other possible collaborators and suppliers, can propose design alternatives to select the most efficient solution in the environment of the project to be carried out: